ORBI Prime

instagram.com
ORBI Prime is one of the top influencer with 10557 audience and 1.16% engagement rate on Instagram. Check out the full profile and start to collaborate.
Publikum
10.6k
Engagement Rate
1.16%
Konten des Kanals

Feed

Winter is here! Get your skis or your board ready to explode the Read More

Imagine this: Waterproof, hands-free 360°recording eyewear. ?

ORBI Marine allows you to capture EVERYTHING from your own perspective in 4K. Whether you are surfing, kite surfing, wakeboarding, jet skiing, snowboarding or skiing, share your full experience from your point of view.

ORBI Marine is now available for pre-order on Kickstarter (link in bio)

Imagine this: Waterproof, hands-free 360°recording eyewear. ? O Read More

Summer and winter vacations have a special place in our hearts!  Read More

#surfing is not just about riding a wave. If it were, than it would NOT have such a devoted following; beginners would quit too fast and the sport would be reserved only for a select group of athletes. #surfing is about overcoming a fear of drowning, it’s about working your #core, it’s about #balance, it’s about #timing, it’s about #mastery, and as one fellow surfer likes to boast #surfing is about #life. Unfortunately, drone footages capturing only the best moments from a safe distance sell #surfing too short. #surfing can be fully experienced only in-person or at least in POV 360. Recently I got into this beautiful sport and am officially hooked.

#surfing is not just about riding a wave. If it were, than it wou Read More

Hundreds of thousands of #runners every day spend hours training Read More

Hey there! We haven't posted in a while because we're busy preparing for mass production. But now, we have a lot of new interesting content recorded with our glasses. We are excited to share it with you. Stay tuned!
⠀
#orbiprime #travel #travelusa #travelguide #360camera #techgigs

Hey there! We haven't posted in a while because we're busy prepar Read More

We are excited to share an update on our progress the last month

Production Update

Great news is that we have purchased all necessary equipment (jigs&fixtures) for the complete assembly line and right now the assembly line is being tested on the engineering validation test (EVT) build pilot run. 
Were really excited to say that ORBI Prime EVT build pre-mass production run is underway.

Several photos from the production line are attached.

The pilot run was a small production run to make sure all of the intended performance tests meet the specifications and functional requirements and tolerances, as well to make sure the production, assembly and glueing processes worked well in practice.
After EVT functional tests are done one production-worthy configuration will be finalized that meets all of the product requirements for functionality, performance, and reliability.

Software Update

We have implemented an additional power mode - standby. As we needed a compromise between power consumption and cold start time. In standby mode CPU and the rest systems except RAM are not powered, so power consumption is very low. But if user wants to shoot something it takes just few seconds to wake up the device and start recording.

What were working through next:

1) A number of connectivity and feature-related bugs are still being worked on and are nearing completion.
2) Fixes to the less frequent app crashing or connectivity challenges
3) In certain situations, camera-specific bugs have popped up and are being addressed.
4) We will have more extensive quality assurance tests in place. Lastly, we underestimated the amount of time needed to handle issues as we rolled out the pre-mass production, we are truly sorry about the delays . That said, know that the team and our partners are committed to working through these last issues as quickly as possible and getting a great product in your hands soon.

Thank you for your patience and incredible support
Team ORBI
We are excited to share an update on our progress the last month

Production Update

Great news is that we have purchased all necessary equipment (jigs&fixtures) for the complete assembly line and right now the assembly line is being tested on the engineering validation test (EVT) build pilot run. 
Were really excited to say that ORBI Prime EVT build pre-mass production run is underway.

Several photos from the production line are attached.

The pilot run was a small production run to make sure all of the intended performance tests meet the specifications and functional requirements and tolerances, as well to make sure the production, assembly and glueing processes worked well in practice.
After EVT functional tests are done one production-worthy configuration will be finalized that meets all of the product requirements for functionality, performance, and reliability.

Software Update

We have implemented an additional power mode - standby. As we needed a compromise between power consumption and cold start time. In standby mode CPU and the rest systems except RAM are not powered, so power consumption is very low. But if user wants to shoot something it takes just few seconds to wake up the device and start recording.

What were working through next:

1) A number of connectivity and feature-related bugs are still being worked on and are nearing completion.
2) Fixes to the less frequent app crashing or connectivity challenges
3) In certain situations, camera-specific bugs have popped up and are being addressed.
4) We will have more extensive quality assurance tests in place. Lastly, we underestimated the amount of time needed to handle issues as we rolled out the pre-mass production, we are truly sorry about the delays . That said, know that the team and our partners are committed to working through these last issues as quickly as possible and getting a great product in your hands soon.

Thank you for your patience and incredible support
Team ORBI
We are excited to share an update on our progress the last month

Production Update

Great news is that we have purchased all necessary equipment (jigs&fixtures) for the complete assembly line and right now the assembly line is being tested on the engineering validation test (EVT) build pilot run. 
Were really excited to say that ORBI Prime EVT build pre-mass production run is underway.

Several photos from the production line are attached.

The pilot run was a small production run to make sure all of the intended performance tests meet the specifications and functional requirements and tolerances, as well to make sure the production, assembly and glueing processes worked well in practice.
After EVT functional tests are done one production-worthy configuration will be finalized that meets all of the product requirements for functionality, performance, and reliability.

Software Update

We have implemented an additional power mode - standby. As we needed a compromise between power consumption and cold start time. In standby mode CPU and the rest systems except RAM are not powered, so power consumption is very low. But if user wants to shoot something it takes just few seconds to wake up the device and start recording.

What were working through next:

1) A number of connectivity and feature-related bugs are still being worked on and are nearing completion.
2) Fixes to the less frequent app crashing or connectivity challenges
3) In certain situations, camera-specific bugs have popped up and are being addressed.
4) We will have more extensive quality assurance tests in place. Lastly, we underestimated the amount of time needed to handle issues as we rolled out the pre-mass production, we are truly sorry about the delays . That said, know that the team and our partners are committed to working through these last issues as quickly as possible and getting a great product in your hands soon.

Thank you for your patience and incredible support
Team ORBI
We are excited to share an update on our progress the last month

Production Update

Great news is that we have purchased all necessary equipment (jigs&fixtures) for the complete assembly line and right now the assembly line is being tested on the engineering validation test (EVT) build pilot run. 
Were really excited to say that ORBI Prime EVT build pre-mass production run is underway.

Several photos from the production line are attached.

The pilot run was a small production run to make sure all of the intended performance tests meet the specifications and functional requirements and tolerances, as well to make sure the production, assembly and glueing processes worked well in practice.
After EVT functional tests are done one production-worthy configuration will be finalized that meets all of the product requirements for functionality, performance, and reliability.

Software Update

We have implemented an additional power mode - standby. As we needed a compromise between power consumption and cold start time. In standby mode CPU and the rest systems except RAM are not powered, so power consumption is very low. But if user wants to shoot something it takes just few seconds to wake up the device and start recording.

What were working through next:

1) A number of connectivity and feature-related bugs are still being worked on and are nearing completion.
2) Fixes to the less frequent app crashing or connectivity challenges
3) In certain situations, camera-specific bugs have popped up and are being addressed.
4) We will have more extensive quality assurance tests in place. Lastly, we underestimated the amount of time needed to handle issues as we rolled out the pre-mass production, we are truly sorry about the delays . That said, know that the team and our partners are committed to working through these last issues as quickly as possible and getting a great product in your hands soon.

Thank you for your patience and incredible support
Team ORBI
We are excited to share an update on our progress the last month

Production Update

Great news is that we have purchased all necessary equipment (jigs&fixtures) for the complete assembly line and right now the assembly line is being tested on the engineering validation test (EVT) build pilot run. 
Were really excited to say that ORBI Prime EVT build pre-mass production run is underway.

Several photos from the production line are attached.

The pilot run was a small production run to make sure all of the intended performance tests meet the specifications and functional requirements and tolerances, as well to make sure the production, assembly and glueing processes worked well in practice.
After EVT functional tests are done one production-worthy configuration will be finalized that meets all of the product requirements for functionality, performance, and reliability.

Software Update

We have implemented an additional power mode - standby. As we needed a compromise between power consumption and cold start time. In standby mode CPU and the rest systems except RAM are not powered, so power consumption is very low. But if user wants to shoot something it takes just few seconds to wake up the device and start recording.

What were working through next:

1) A number of connectivity and feature-related bugs are still being worked on and are nearing completion.
2) Fixes to the less frequent app crashing or connectivity challenges
3) In certain situations, camera-specific bugs have popped up and are being addressed.
4) We will have more extensive quality assurance tests in place. Lastly, we underestimated the amount of time needed to handle issues as we rolled out the pre-mass production, we are truly sorry about the delays . That said, know that the team and our partners are committed to working through these last issues as quickly as possible and getting a great product in your hands soon.

Thank you for your patience and incredible support
Team ORBI
We are excited to share an update on our progress the last month

Production Update

Great news is that we have purchased all necessary equipment (jigs&fixtures) for the complete assembly line and right now the assembly line is being tested on the engineering validation test (EVT) build pilot run. 
Were really excited to say that ORBI Prime EVT build pre-mass production run is underway.

Several photos from the production line are attached.

The pilot run was a small production run to make sure all of the intended performance tests meet the specifications and functional requirements and tolerances, as well to make sure the production, assembly and glueing processes worked well in practice.
After EVT functional tests are done one production-worthy configuration will be finalized that meets all of the product requirements for functionality, performance, and reliability.

Software Update

We have implemented an additional power mode - standby. As we needed a compromise between power consumption and cold start time. In standby mode CPU and the rest systems except RAM are not powered, so power consumption is very low. But if user wants to shoot something it takes just few seconds to wake up the device and start recording.

What were working through next:

1) A number of connectivity and feature-related bugs are still being worked on and are nearing completion.
2) Fixes to the less frequent app crashing or connectivity challenges
3) In certain situations, camera-specific bugs have popped up and are being addressed.
4) We will have more extensive quality assurance tests in place. Lastly, we underestimated the amount of time needed to handle issues as we rolled out the pre-mass production, we are truly sorry about the delays . That said, know that the team and our partners are committed to working through these last issues as quickly as possible and getting a great product in your hands soon.

Thank you for your patience and incredible support
Team ORBI
We are excited to share an update on our progress the last month

Production Update

Great news is that we have purchased all necessary equipment (jigs&fixtures) for the complete assembly line and right now the assembly line is being tested on the engineering validation test (EVT) build pilot run. 
Were really excited to say that ORBI Prime EVT build pre-mass production run is underway.

Several photos from the production line are attached.

The pilot run was a small production run to make sure all of the intended performance tests meet the specifications and functional requirements and tolerances, as well to make sure the production, assembly and glueing processes worked well in practice.
After EVT functional tests are done one production-worthy configuration will be finalized that meets all of the product requirements for functionality, performance, and reliability.

Software Update

We have implemented an additional power mode - standby. As we needed a compromise between power consumption and cold start time. In standby mode CPU and the rest systems except RAM are not powered, so power consumption is very low. But if user wants to shoot something it takes just few seconds to wake up the device and start recording.

What were working through next:

1) A number of connectivity and feature-related bugs are still being worked on and are nearing completion.
2) Fixes to the less frequent app crashing or connectivity challenges
3) In certain situations, camera-specific bugs have popped up and are being addressed.
4) We will have more extensive quality assurance tests in place. Lastly, we underestimated the amount of time needed to handle issues as we rolled out the pre-mass production, we are truly sorry about the delays . That said, know that the team and our partners are committed to working through these last issues as quickly as possible and getting a great product in your hands soon.

Thank you for your patience and incredible support
Team ORBI
We are excited to share an update on our progress the last month

Production Update

Great news is that we have purchased all necessary equipment (jigs&fixtures) for the complete assembly line and right now the assembly line is being tested on the engineering validation test (EVT) build pilot run. 
Were really excited to say that ORBI Prime EVT build pre-mass production run is underway.

Several photos from the production line are attached.

The pilot run was a small production run to make sure all of the intended performance tests meet the specifications and functional requirements and tolerances, as well to make sure the production, assembly and glueing processes worked well in practice.
After EVT functional tests are done one production-worthy configuration will be finalized that meets all of the product requirements for functionality, performance, and reliability.

Software Update

We have implemented an additional power mode - standby. As we needed a compromise between power consumption and cold start time. In standby mode CPU and the rest systems except RAM are not powered, so power consumption is very low. But if user wants to shoot something it takes just few seconds to wake up the device and start recording.

What were working through next:

1) A number of connectivity and feature-related bugs are still being worked on and are nearing completion.
2) Fixes to the less frequent app crashing or connectivity challenges
3) In certain situations, camera-specific bugs have popped up and are being addressed.
4) We will have more extensive quality assurance tests in place. Lastly, we underestimated the amount of time needed to handle issues as we rolled out the pre-mass production, we are truly sorry about the delays . That said, know that the team and our partners are committed to working through these last issues as quickly as possible and getting a great product in your hands soon.

Thank you for your patience and incredible support
Team ORBI

We are excited to share an update on our progress the last month Read More

The entire world is watching the FIFA World Cup! Is anyone planni Read More

Dear All! ?‍♂️ Since our last update, we have been working hard on the manufacturing preparations for the ORBI Prime for another 2 months. ??
.
In the last update, we shared major updates in terms of hardware developments. All these improvements were implemented into the EVT build design and now we have completed the tooling and PCB fabrication. The PCB fabrication and assembly started on June 4th and was completed on June 15th. The bring up of the boards is scheduled on June 18th. The rough tooling for all parts was completed on June 15th and now minor corrections to the tools are being made. Once fine-tuned, the polishing for all EVT build tooling parts is scheduled to be completed by EOM June. Above you may find some images taken inside the factory site. ⬆️⬆️⬆️
.
The firmware part is also being fine tuned, we have been producing and testing both video and photo modes. ??
.
The development of the mobile app is also running at a full pace. We have tested the mobile stitching on iOS version of the mobile app and continuing development of the mobile editor. After a period of testing, a number of bugs have been detected and resolved. ?
.
We are putting immense efforts to keep up with our timeline and deliver ORBI Prime as per our indicated timeline this coming August. ?
.
Thank you for your support and patience. ??
.
Sincerely,
Team ORBI
Dear All! ?‍♂️ Since our last update, we have been working hard on the manufacturing preparations for the ORBI Prime for another 2 months. ??
.
In the last update, we shared major updates in terms of hardware developments. All these improvements were implemented into the EVT build design and now we have completed the tooling and PCB fabrication. The PCB fabrication and assembly started on June 4th and was completed on June 15th. The bring up of the boards is scheduled on June 18th. The rough tooling for all parts was completed on June 15th and now minor corrections to the tools are being made. Once fine-tuned, the polishing for all EVT build tooling parts is scheduled to be completed by EOM June. Above you may find some images taken inside the factory site. ⬆️⬆️⬆️
.
The firmware part is also being fine tuned, we have been producing and testing both video and photo modes. ??
.
The development of the mobile app is also running at a full pace. We have tested the mobile stitching on iOS version of the mobile app and continuing development of the mobile editor. After a period of testing, a number of bugs have been detected and resolved. ?
.
We are putting immense efforts to keep up with our timeline and deliver ORBI Prime as per our indicated timeline this coming August. ?
.
Thank you for your support and patience. ??
.
Sincerely,
Team ORBI
Dear All! ?‍♂️ Since our last update, we have been working hard on the manufacturing preparations for the ORBI Prime for another 2 months. ??
.
In the last update, we shared major updates in terms of hardware developments. All these improvements were implemented into the EVT build design and now we have completed the tooling and PCB fabrication. The PCB fabrication and assembly started on June 4th and was completed on June 15th. The bring up of the boards is scheduled on June 18th. The rough tooling for all parts was completed on June 15th and now minor corrections to the tools are being made. Once fine-tuned, the polishing for all EVT build tooling parts is scheduled to be completed by EOM June. Above you may find some images taken inside the factory site. ⬆️⬆️⬆️
.
The firmware part is also being fine tuned, we have been producing and testing both video and photo modes. ??
.
The development of the mobile app is also running at a full pace. We have tested the mobile stitching on iOS version of the mobile app and continuing development of the mobile editor. After a period of testing, a number of bugs have been detected and resolved. ?
.
We are putting immense efforts to keep up with our timeline and deliver ORBI Prime as per our indicated timeline this coming August. ?
.
Thank you for your support and patience. ??
.
Sincerely,
Team ORBI
Dear All! ?‍♂️ Since our last update, we have been working hard on the manufacturing preparations for the ORBI Prime for another 2 months. ??
.
In the last update, we shared major updates in terms of hardware developments. All these improvements were implemented into the EVT build design and now we have completed the tooling and PCB fabrication. The PCB fabrication and assembly started on June 4th and was completed on June 15th. The bring up of the boards is scheduled on June 18th. The rough tooling for all parts was completed on June 15th and now minor corrections to the tools are being made. Once fine-tuned, the polishing for all EVT build tooling parts is scheduled to be completed by EOM June. Above you may find some images taken inside the factory site. ⬆️⬆️⬆️
.
The firmware part is also being fine tuned, we have been producing and testing both video and photo modes. ??
.
The development of the mobile app is also running at a full pace. We have tested the mobile stitching on iOS version of the mobile app and continuing development of the mobile editor. After a period of testing, a number of bugs have been detected and resolved. ?
.
We are putting immense efforts to keep up with our timeline and deliver ORBI Prime as per our indicated timeline this coming August. ?
.
Thank you for your support and patience. ??
.
Sincerely,
Team ORBI
Dear All! ?‍♂️ Since our last update, we have been working hard on the manufacturing preparations for the ORBI Prime for another 2 months. ??
.
In the last update, we shared major updates in terms of hardware developments. All these improvements were implemented into the EVT build design and now we have completed the tooling and PCB fabrication. The PCB fabrication and assembly started on June 4th and was completed on June 15th. The bring up of the boards is scheduled on June 18th. The rough tooling for all parts was completed on June 15th and now minor corrections to the tools are being made. Once fine-tuned, the polishing for all EVT build tooling parts is scheduled to be completed by EOM June. Above you may find some images taken inside the factory site. ⬆️⬆️⬆️
.
The firmware part is also being fine tuned, we have been producing and testing both video and photo modes. ??
.
The development of the mobile app is also running at a full pace. We have tested the mobile stitching on iOS version of the mobile app and continuing development of the mobile editor. After a period of testing, a number of bugs have been detected and resolved. ?
.
We are putting immense efforts to keep up with our timeline and deliver ORBI Prime as per our indicated timeline this coming August. ?
.
Thank you for your support and patience. ??
.
Sincerely,
Team ORBI

Dear All! ?‍♂️ Since our last update, we have been working Read More

×